Construction · Design and build
Connect the building brief with the construction plan
A coordinated appointment should make the design requirements, construction scope and delivery responsibilities easier to understand. We work from the client's intended use, accommodation needs, budget and programme to develop a defined design-and-build proposal.
Construction services by UOAOKOYA Building Projects Limited · RC 10007046
Start with the decisions that shape cost
We review the site information, required spaces, specification, building services, external works and intended performance. Early discussions identify the information still needed and the decisions that affect the cost and sequence of delivery.
Make design responsibility explicit
The appointment identifies the professional team, design responsibilities, approval process and information schedule. Architecture, engineering and other regulated services are undertaken through appropriately qualified and registered professionals where required.
Coordinate the whole building
The proposal connects structural works, building envelope, services, finishes, equipment interfaces and external works. Where specialist packages are involved, their scope, design information and connection to the main works are defined.
For hotel developments
Operational requirements should influence the building early: guest arrival, room layouts, housekeeping routes, food and beverage areas, maintenance access, equipment loads and staff facilities. A separate hotel pre-opening scope can support those decisions where required.
What happens next
Share the brief and current design stage. We will discuss the information needed, the proposed appointment and the basis for preparing a delivery proposal.
Questions, answered
Before we begin.
Can we retain our architect?
Yes. The proposed arrangement can work with an existing design team, with the roles, design liability, approvals and information responsibilities agreed clearly.
Can you offer a fixed price and completion date?
These can be considered once the scope, design information, programme assumptions and allocation of risk are sufficiently defined and accepted in the contract.
Start with your brief
What are you
planning?
Share your location, current stage and the support you need. A short summary is enough to start.
Discuss your project